Welcome to the 183A Phase III Virtual Open House

Our Proposed Solution

The Mobility Authority is proposing to extend 183A north from Hero Way to 1.1 miles north of SH 29 as Phase III of the 183A system. The 6.6-mile proposed tollway will have two tolled lanes in each direction with an option to widen to three lanes in the future. The proposed tollway is planned to be located mostly in the existing right-of-way within the median of the US 183 corridor. Schematic design, traffic modeling, and environmental investigations are underway. The extension will also feature a shared use path north from Hero Way to the proposed Seward Junction Loop project.

Extending the existing 183A Toll will: SAVE commuters time. PROVIDE a reliable transportation option. ELIMINATE the need to use signalized intersections. MINIMIZE community impacts by working within existing right-of-way.
 

Submit an Official Comment

Welcome to the 183A Phase III Virtual Open House

CTA-dropdown-arrow
Upload File (pdf, doc, xlsx only. Max 3MB)Clear

Per Texas Transportation Code, check each of the following boxes that apply to you:

Newsletter

This form may be used to provide written comments on this project.